Concrete calculator

Get cubic yards, bag counts and order sizes with a waste allowance.

Concrete needed
1.36 yd³

1.5 yd³ ready-mix or 62 bags.

Breakdown & share
Before waste
1.23 yd³
Waste allowance
0.12 yd³
Bags to buy
62 × 80 lb
Ready-mix order
1.5 yd³
Estimates only.

Your inputs

Pour shape

Example values. Change any of them.

ft
ft
in
More options
%
$
$

What-if compare

Change a second scenario and see the results side by side.

What it’s made of

Concrete before waste 90.9%Allowance 9.1%

How it’s worked out

See how we got 1.36 yd³

Volume = base area × depth × count. Order volume = volume × (1 + waste%). One cubic yard is 27 cubic feet.

  1. Multiply the rectangular area by depth for 33.33 ft³ across all pours.
  2. Add 10% waste for 1.36 yd³.
  3. Round each purchase quantity upward: 62 bags or 1.5 yd³ of ready-mix.

About this calculator

Bag yields depend on product and bag size. Ready-mix is rounded to quarter units as a planning estimate.

Worked example

Concrete needed · 1.36 yd³

Volume = base area × depth × count. Order volume = volume × (1 + waste%). One cubic yard is 27 cubic feet.

  1. Multiply the rectangular area by depth for 33.33 ft³ across all pours.
  2. Add 10% waste for 1.36 yd³.
  3. Round each purchase quantity upward: 62 bags or 1.5 yd³ of ready-mix.

Common questions

How many cubic feet are in a yard?

There are 27 cubic feet in one cubic yard.

How do I allow for waste?

Use More options to change the allowance for spill and uneven ground.

Do these measurements size a footing?

Enter dimensions from the project plan. This tool estimates volume for those dimensions.

Formula sources

Reference checked November 22, 2026.